| Practical
problem: |
 |
Capital
design decisions regarding the amount of roof
ventilators and/or insulation. |
 |
Design for minimum
ventilation rates to ensure contaminant removal. |
| |
|
| Specifications
for simulation: |
 |
Fully
integrated hourly simulation of building thermal
performance, stack and wind effect. (No such easy to use
software was found) |
| |
|
| Verification: |
 |
Temperature
verification results. |
| |
|
| Results: |
 |
For capital
investment
make an informed decision between the amount of
roof ventilators and/or insulation. |
 |
Often the Air
change rate need to be calculated to see if contaminants will be removed. |
| |
|
| References: |
 |
Mathews, E.H.
and Rousseau, P.G., A new integrated design tool
for naturally ventilated buildings part 1:
Ventilation model, Building and environment,
Vol. 29, No. 4, pp471-471, 1994 |
| |
|
 |
Rousseau, P.G.
and Mathews, E.H., A new integrated design tool
for naturally ventilated buildings part 2:
Integration and Application, Building and
environment, Vol. 29, No. 4, pp473-484, 1994 |