Case Study 2 - Aula Auditorium

 

Purpose:
Select a new cooling and heating plant.
   
Problem:
Dynamic load simulations are needed to obtain capacities for certain operating time schedules.
   
Solution:
NewQUICK performs dynamic load simulations which include operating time scheduling.
   
Results:
Efficient plant was selected for the specified operating time schedules.
   
References:
MW Ellis, Refurbishment of the HVAC system of the Aula, TEMM International (Pty) Ltd., P.O. Box 13516, Hatfield, Pretoria, South Africa, 0028, 1998.